Picture Post: Don’t forget: The Broadway Bridge will close to ALL vehicles beginning Monday, October 13th. Portland Streetcar will serve the Eastside via the Tilikum Crossing, and the platform at NW 9th and Lovejoy will temporarily close. TriMet line 17 will move to the Steel Bridge.
Photo of Portland Streetcar 001 preparing to turn left from the Broadway Bridge.Photo of Portland Streetcar 009 turning on to the Broadway Bridge.Photo of a TriMet line 17 bus heading eastbound from the Broadway Bridge.Photo of the Portland Streetcar platform at NW 9th and Lovejoy showing signage about the upcoming Broadway Bridge closure.Photo of an unidentified Portland Streetcar at NE Broadway & Ross.